Boat Projects

Over the past few years, people often ask – “what are you doing this weekend?” The answer has most often been “working on my boat”. So I thought – for those who are interested, why not share a little more about what that has actually looked like?

Forward Head Renovations

Replaced bamboo coverings and original 1982 vinyl underneath with custom-designed solid mahogany cabinets and drawers, along with stick on tiles.

Aft Head Renovations

Similar to forward head, but with a new Raritan Marine Elegance Electric head, tied into the Raritan Marine Sanitation Device and a new bidet.

New Fuel System

I was having problems with the engine, diesel heater and generator due to fuel — so I totally redesigned and rebuilt the system.

Upgraded Internal Lighting

Replaced old Alpenglow lights with new LED ones; added Hue Lightstrips and Controls.

Bidet

Just a little project…

Galley Upgrades

Replaced the stove with a new Force 10, replaced the microwave with a new combo microwave, toaster, air fryer and convection oven. Replaced the compressors and refrigeration units for the fridge and the freezer.

Generator Removal

The generator was an Apollo (Kubota-based) diesel engine, which produced 4kVa. It had 5200 engine hours and needed a bit of maintenance. Also, with the new lithiums, Victron system and planned solar expansion, we wanted to eliminate it from our systems.

Bilge Pump Replacement

The old bilge pumps were failing. These are a critical boat safety component.

Bow Seat

For the bathing beauties who join us…a custom-made seat up front.

Chain Counter

Added a chain counter to assist while anchoring.

Cockpit Painting

This was badly in need of a re-fresh, but we wanted to wait until after hauling out the engine, generator, A/C, refrigeration and heating systems.

Heater & AC

Replacement of the diesel heating system and the central air conditioning with a combined Heat/AC heat-pump based system.

Diesel Tank Remodel

The diesel tank needed cleaning. But I couldn’t get at it. So I remodelled it.

Electrical System

This HUGE project has been underway for years. I’m not sure it will ever stop. But here is a sense…

Engine & Transmission Replacement

This was another huge project which took months to plan and just over a week to execute.

Forward Deck Rebuild

During the last survey, some hollowness was discovered. Wow. Was there ever. Right under the windlass.

Ground Tackle Upgrades

The stuff that holds you in place when you aren’t near shore (anchor, chain, windlass, ….)

Hot Water Heater Replacement

Hot water is a really nice thing to have, especially for showers.

Salon Table Replacement

The previous single pedestal unit was taken out. There is a story…

Watermaker Replacement

The old watermaker was an energy hog and blew apart after we sailed to Vancouver Island from Hawaii.

Requirements Between Projects

Sometimes one needs to relax and recuperate between projects…